Bridge painting will require a lane closure on State Route 125 beginning Friday, April 3.

Portable concrete barrier wall will be in place for a right lane closure on westbound SR 125 from Burke Road to the bridge over Poplar Creek. The lane closure will remain in place for approximately two months during bridge painting operations.

Arrow boards and/or signs will be in place to alert motorists of the upcoming lane closure and work is dependent on weather.

To help ensure the safety of the construction workers as well as the traveling public, motorists should remain alert, reduce their speed and watch for stopped traffic while passing through the work zone.